Hayward Tyler Inc and its sister company Energy Steel have been awarded multi-million dollar contracts to help the ITER challenge in France.
The ITER Project, St-Paul-lez-Durance, France, October 2021 – Image © Les Nouveaux Médias/SNC ENGAGE.
Hayward Tyler’s contract covers variable drive booster pumps whereas Energy Steel will supply sixty two solenoid valve and cubicle packages.
The ITER project is a joint international research and growth project to demonstrate the scientific and technical feasibility of fusion energy. The demonstration facility is beneath building in St-Paul-lez-Durance in France, and will be the largest fusion experimental reactor in the world.
เกจวัดแก๊สหุงต้ม shall be an integral part of the drying system for the Tokamak Cooling Water System (TCWS). The pumps might be designed, built and tested at Hayward Tyler Inc in Colchester, Vermont, USA.
Hayward Tyler and Energy Steel are both a half of the Engineered Pumps and Motors Division of Avingtrans plc.
“We are elated that two of our corporations can provide products that can contribute to this formidable project,” said Mike Turmelle, managing director of Avingtrans’ Engineered Pumps and Motors Division. “We’re committed and proud to contribute to the superior nuclear business.” These contracts comply with previous awards that ITER has made to Avingtrans’ Engineered Pumps and Motors Division.
Share